1) 10 MW El-Fasher DG Plant & 6 MW El-Genena DG Plant for National Electricity Corporation (NEC), Sudan – Year 2008

Client Name : Neilan International Company Limited, Sudan

End User : National Electricity Corporation (NEC), Sudan

Scope of Work:Supply, Installation, Testing and Commissioning of Electrical and Control & Instrumentation Systems

» Supply, and Installation of the following Electrical items :
         » Transformers
         » Battery with chargers
         » Redundancy, change of short circuit level
         » 33 KV Switchyard Equipments
         » HT Panels / MCC Panels
         » DCDB / ACDB
         » Local Push Button Stations
         » Lighting Poles
         » Lighting Fixtures
         » Earthing & Lightning Protection System
         » Power & Control Cables
         » Cable Trays
         » Fire Fighting Systems
         » Conduits
         » Glands & Lugs
         » Junction Boxes
         » HRSG Boilers
         » Air Compressor
         » HT/LT Radiator
         » Pre Fabrication materials for DG Plant
         » Tools & Tackles
         » Hydraulic Mobile Crane
         » Erection Hardwares

» Supply, and Installation of the following instrumentation items :
         » PLC & DCS Panels
         » Transmitters
         » Level Gauges
         » Temperature Gauges
         » Pressure Gauges
         » Digital Indicator
         » Thermocouple DP Switches
         » Analyzers
         » Cable & Accessories
         » Cable Trays
         » Junction Boxes
         » Smoke detector
         » Consumables

2) ZADCO MPP Project for ZADCO at Umm Al Dalak, U.A.E – Year 2008

Client Name : Gulf Oil & Gas L.L.C, Abudhabi, U.A.E

End User : ZADCO at Umm Al Dalak, U.A.E

Scope of Work:Installation, Testing and Commissioning of Electrical and Control & Instrumentation Systems

» Installation of the following Electrical items :
         » Transformers
         » Local Push Button Stations
         » Earthing & Lightning Protection System
         » Power & Control Cables
         » Cable Trays
         » Conduits
         » Glands & Lugs
         » Junction Boxes
         » Erection Hardwares

» Installation of the following Instrumentation Systems :
         » Pressure Transmitter
         » Temperature Transmitter
         » Pressure Control Valve
         » Gauges for PMV Valve positioned
         » Digital Positioner
         » Temperature Element c/w Thermowell
         » Junction Boxes
         » Cable Trays
         » Panels
         » Cables
         » Cables & Accessories
         » Cable Trays
         » Junction Boxes
         » Consumables

3) Caustic Soda Charging System Up gradation Project for Dubai Aluminium Company Limited, Abudhabi, U.A.E – Year 2007

Client Name : Almoayyed Electrical & Instrumentation System, U.A.E

End User : Dubai Aluminium Company Limited, Abudhabi, U.A.E

Scope of Work:Supply, Installation, Testing and Commissioning of the following Electrical & Control & Instrumentation Systems

» Installation of the following Electrical items :
         » 2.2 KW Starter Panels for Loading Pumps
         » 230 V AC provision for Metering Pumps & PLC panels

» Installation of the following Instrumentation Systems :
         » Pressure Transmitter
         » Temperature Transmitter
         » Pressure Control Valve
         » Gauges for PMV Valve positioned
         » Digital Positioner
         » PLC Systems with necessary accessories
         » Panels